EMT ENERGY · EMT-NEP-X LIVE
EMT-NEP-X live simulator
Choose where to install the 1 MW EMT-NEP-X microreactor and watch, hour by hour, how much electricity and heat reach homes, industry and remote bases. Module values come from the design calculation.
EMT-NEP-X · Operations center
Site —
—
Modules in service —
18:00
ElectricityHeat
Artist’s illustration
Configurazione · Città
Installed modules
Modules
Select a module to take it out for maintenance or return it to service.
Live balance
—
—
- Electricity generation—
- Electricity to users—
- Grid exchange—
- Electricity coverage—
- Heat supplied · coverage—
- Unused heat—
Event log
Trend · last 24 hours
electricitydemandheatheat demandinstalled capacity
Since the simulation started
- Electricity
- —
- Heat
- —
- Natural gas avoided
- —
- CO₂ not emitted
- —
- At the simulated pace, per year
- —
- Fuel cycle used
- —
- Core life at average load
- —
Simulated time
How the model works
- Each 1 MW thermal module produces up to 303 kW of electricity with its integrated closed-cycle Brayton turbine and delivers up to 373 kW of heat to district-heating water at 60 to 90 °C. Design values calculated and verified to international research standards.
- On the grid you choose baseload (modules at 100 %, the grid covers peaks and takes the surplus) or load following (30 to 100 % of power, by varying the gas inventory in the circuit). Off the grid the modules always follow demand and surplus electricity at minimum load becomes useful heat. Any module can be taken out for maintenance: the event log reports grid draws and uncovered heat or electricity.
- Adjustable site parameters: electricity use per household (2,700 kWh a year to start, 2.3 people), homes connected to district heating (7,500 kWh of heating a year each), industrial shifts and process heat, people on the isolated base and their per-person needs.
- Fossil fuel avoided with the same factors as the published study: on the grid, natural gas (combined-cycle plant 55 %, boiler 90 %, 2.004 kg of CO₂ per Sm³, ISPRA); off the grid, diesel (generator 0.27 l/kWh, boiler 0.118 l/kWh, 2.646 kg of CO₂ per liter). CO₂ is net of nuclear life-cycle emissions (12 g per kWh of electricity, IPCC median).
- Autonomy: about 8.3 years at full power without refuelling, longer at reduced load. The panel shows the share of the fuel cycle used and the core life at the simulated average load.